![]() |
||
|
Foothill Drive Corridor Study May 2008 Open House Presentation, now available Residents attended a public open house on May 13, 2008 to review the Foothill Drive Corridor Study alternatives and to provide comment on the recommended option. A formal presentation describing the alternatives and the study data was presented. The PDF of the presentation is now available. This project is a joint effort of the Utah Department of Transportation (UDOT), the Utah Transit Authority (UTA), Salt Lake City, the University of Utah and the Wasatch Front Regional Council (WFRC). Foothill Drive is a vital corridor along the east bench of the Wasatch Mountains in Salt
Lake City. (Open the Project Area map in PDF format). The thoroughfare extends from the I-80 and I-215 freeways on its south end to the University of Utah along 500 South on the This project is a joint effort of the Wasatch Front Regional Council (WFRC), the Utah Department of Transportation (UDOT), the Utah Transit Authority (UTA), Salt Lake City and the University of Utah. For more information, contact Bethany Matsumori at bethany@wfandco.com or 801.364.0088 ext. 109. |
||